Tal and I are almost done with our half bath makeover! Over the last week, Tal grouted the floor tile, as well as installed and caulked the trim and shoe molding before I painted them. Then, a plumber installed the new toilet. Next, Tal and I installed the pedestal sink, a new faucet, a new toilet paper holder, and a new towel ring. Tal also attached the transition piece that separates the tile and wood floors. We still need to install the new light and do some touch-ups and clean-up, but we hope to finish our half bathroom this week. The end is in sight!
Hadley wanted me to take a picture of her in our bathroom:
No comments:
Post a Comment